WWTP Rehabilitation of Air Distribution System

Project consisted of the demolition of existing air piping, 800LF of new 30 inch air distribution piping with control valves & bellows supported both overhead & underground. Approximately 120 LF of 16-inch temporary air bypass piping. This project was critical to resolving GUC’s identified issues with compressed air delivery to the South Aeration Basins. An energy efficiency study quantified energy losses in the air piping of over $172k/year.

PROJECT LOCATION

Greenville, NC

ENGINEER

Hazen and Sawyer

PROJECT COST

$1,615,115

CLIENT

Greenville Utilities Commission